ABC County Planning
Powered By SBS Portals
Building Permit No.
Owner Name
911/Property Address
City, State & Zip
Phone
Email
Inspections Required
A. Foundation/Post Hole Inspection
A) Inspection of the foundation shall be made after poles or piers are set or trenches or basement areas areexcavated and any required forms erected and any required reinforcing steel is in place and prior to the placing of concrete (minimum of 36" from bottom of foundation to finish grade).
B) The pre-slab inspection: shall include excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, or equipment and special requirements for wood foundations. Sanitary lines shall be air tested (5-PSI for 15 minutes). If joints in supply lines must be used, an air test of at least 50-PSI is required.
B. Plumbing, mechanical, gas and electrical systems inspection
Rough inspection of plumbing, mechanical, gas and electrical systems shall be made prior to covering or concealment, before fixtures or appliances are set or installed, during frame inspection. EXCEPTION: Ground-source heat pump loop systems tested in accordance with Section 2105.1 shall be permitted to be backfilled prior to inspection.
C. Frame & Masonry Inspection
Inspection of framing and masonry construction shall be made after the roof, masonry, all framing, firestopping, draftstopping and bracing are in place. The owner or Agent must provide truss drawings.
D. Truss Form Req
E. Pre-Drywall
Inspection of insulation/vapor barrier.
F. Final Inspection
Final inspection shall be made after the permitted work is complete and prior to occupancy.
Comments
Add section
Type of Inspection
A. Foundation Inspection
B. Plumbing, mechanical, gas and electrical systems inspection
C. Frame & Masonry Inspection
D. Pre-Drywall
E. Truss Form Req
F. Final Inspection
Inspection Date
(mm-dd-yyyy)
BI initials
Building Inspector Comments
Remove
SFLECC Reviewed
No
Yes
Applicant Signature
Click here to sign
Date Signed
(mm-dd-yyyy)
Enter the code here